Project 945A

Sierra II class

 

Drawings:

Ships:

K-534 - Krasnoye Sormovo, Gorkiy - serial no. 303 - laid down 15.2.86 - launched 8.7.89 - completed 26.12.90; 10.8 to 1.9.89 towed to Severodvinsk for fitting out, via inland waterways; 14.3.91 accepted into the Northern Fleet, 6th Submarine Division; 6.92 to 8.92 advanced acoustic tests in the White Sea; 3.6.92 reclassified as an ABPL, and renamed "B-534"; 5.92 to 9.92 first operational tour; 6.4.93 renamed "Zubatka"; 1993 second operational tour; from 1.10.94 attached to the 7th Submarine Division; 10.94 to 12.94 third operational tour; 25.3.95 renamed "Nizhniy Novgorod"; 1997 operational tour; 12.1.2002 to SRZ Nerpa, Oleniya for repairs - completed 2008 - again attached to the 7th Submarine Division

K-336 - Krasnoye Sormovo, Gorkiy - serial no. 304 - laid down 29.7.89 - launched 28.7.92 - completed 14.12.93; 3.6.92 reclassified as ABPL, and renamed "B-336"; 8.92 towed to Severodvinsk for fitting out, via inland waterways - on the dock pontoon "Oka"; 6.4.93 renamed "Okun"; 21.1.94 accepted into the Northern Fleet, 6th Submarine Division; from 1.10.94 attached to the 7th Submarine Division; 3.4.96 renamed "Pskov"; 23.10.97 deep dive test to 520m; 9.98 to 11.98 operational tour - tracked a foreign submarine for 480 hrs; 9.99 to 1.2000 operational tour; 11.2000 to 12.2000 tested the newest hydroacoustic equipment; 2.2003 repairs at Roslyakovo; 10.2003 weapons exercise; 2011 at SRZ Nerpa, Oleniya - 2014 still there, awaiting modernisation

K-535 - Krasnoye Sormovo, Gorkiy - serial no. 305 - laid down 3.90; Project 945AB; never completed - scrapped 11.93

K-? - Krasnoye Sormovo, Gorkiy - serial no. 306 - probably not laid down; Project 945AB