4th independent Engineering & Test Unit
4-я отдельная инженерно-испытательная часть
Military Unit: 25921
Activated 18.4.73 in Leninsk, Kzyl-Orda Oblast, under the
4th Test
Department, Baikonur Test Center (5th NIIP).
The units main tasks was missile/complex tests and orbital
launches with the UR-500 (Proton) launcher.
US designation: Baikonur Test Center - Launch Complex G (two
Type II pads)
Baikonur Test Center - Site 200 (46 02 17N, 63 01 58E)
-
two 8K82K pads - built 2.71-1976
-
PU39 (left) - first launch 20.2.80 (Raduga 6) - total of
110+ launches - still in use
-
PU40 (right) - first launch 24.7.77 (Raduga 6), last launch
31.3.91 (Almaz 1) - total of 64 launches - preserved
-
PU39 maintenance/repair 5.86-11.86
Baikonur Test Center - Site 201 (46 01 49N, 63 01 45E)
- launch control center for Site 200 - built 1971-1976
- still in use
Baikonur Test Center - Site 92 (46 03 29N, 62 56 04E)
- Support/technical area for Sites 81, 90, 200 and the various UR-100
sites
- old integration and test building (MIK-92) built 1964 for the 8K82
launcher - Site 92-1 (46 03 25N, 62 56 00E)
- new integration and test building (MIK-92A-50) built 1987? for the 8K82K
launcher - Site 92A-50 (46 03 40N, 62 55 27E)
- integration and test building (MIK-92-2) built ? for the 11K69 launcher
- Site 92-2 (46 03 31N, 62 55 54E)
- missile ready building for the UR-100 missile - 46 03 36N, 62 55 52E
HQ at Site 95 (46 03 18N, 62 56 35E).