25th independent Engineering & Test Unit
25-я отдельная инженерно-испытательная часть
Military Unit: 74829
Activated 1.5.64 in Leninsk, Kzyl-Orda Oblast, under the
2nd Test
Department, Baikonur Test Center (5th NIIP).
The units main task was missile/complex tests and training with the 8K67
(SS-9) and later the 15A14 (SS-18) ICBM's.
Disbanded 1980.
US designation: Baikonur Test Center - Launch Complex I (six
Type IIIC silos)
Baikonur Test Center - Site 102 (45 55 58N, 63 26 09E)
-
one 8K67 silo (US launch site I1) - built 3.64-1965
-
also control site for launch group (Site 102, 140, 141 and
142)
-
8K67: first launch 21.8.65
-
modernized for the 15A14 (SS-18) missile 9.77-5.78
-
15A14: only one launch test (29.6.78)
-
several silo modifications for the 15A18 (SS-18) missile
were made during the period 10.83-6.88
-
15A18/15A18M: 14 launches 29.9.78-5.2.86
-
demolished 1990's
-
drawing (1965)
-
artist's impression one
(1965, under construction) and two
(1966)
Baikonur Test Center - Site 140 (45 59 48N, 63 33 12E)
-
one 8K67 silo (US launch site I5) - built 3.64-1965
-
8K67: 20 launches 9.7.65-18.12.68
-
modernized for the 15A14 (SS-18) missile 9.70-11.72
-
15A14: 10 launches 4.7.73-12.2.78
-
modernized for the 15A18M (SS-18M) missile 10.83-6.87
-
15A18M: 9 launches 4.9.87-28.10.91
-
demolished 18.8.95
-
original US designation: launch site B2
-
drawing (1966)
-
artist's impression
(1966)
Baikonur Test Center - Site 141 (45 54 37N, 63 20 56E)
-
one 8K67 silo (US launch site I4) - built 3.64-1965
-
8K67: 10 launches 1.10.65-14.8.64
-
modernized for the 15A14 (SS-18) missile 9.70-11.72
-
15A14: experiments on 15A14 electrical mock-up's from 1973
-
demolished 7.9.95
-
original US designation: launch site A3
-
drawing (1966)
-
artist's impression
(1966)
Baikonur Test Center - Site 142 (45 56 27N, 63 27 43E)
-
three 8K67 silos (US launch site I7) - built 1967-1968
-
8K67: PU34 - 20 launches 28.10.68-25.6.75; PU35 - 20
launches 18.4.68-8.10.73; PU36 - 30 launches 2.4.69-19.1.75
-
demolished early 1980's
Sites 102, 140 and 141 were probably transferred to the
26th independent Engineering & Test Unit in 11.71.
HQ 25th independent Engineering & Test Unit was at Site 43, and
support came from Site 42 (see the 39th independent
Engineering & Test Unit)